Owner
                                
                                
                                    
            Crossrail Ltd. - TfL
      
                                
                             
                                                                            
                                
                                    Client
                                
                                
                                    
            Bam Ferrovial Kier BFK
      
                                
                             
                                                                            
                                                                            
                                
                                    Timeframe
                                
                                
                                    April 2012
                                                                             — October 2015
                                                                                                        
                             
                                                                            
                                
                                    Services performed
                                
                                
                                    
            Design of the primary sprayed concrete linings and excavation stability including depressurisation/dewatering. 3D FE modelling of all SCL tunnels including excavation steps.
      
                                
                             
                                                                            
                                
                                    Description
                                
                                
                                    
            Farringdon station is situated at the heart of London's rail network and will be one of its major rail interchange stations, which will link Crossrail, Thameslink services and London Underground trains. The station layout includes two ticket halls, two escalator inclines, two platform tunnels, connecting cross passages, concourse tunnels and ventilation adits. The chosen tunnelling system for Farringdon Station was sprayed concrete lining (SCL). The station comprised a total of 1km of SCL tunnels at depths of up to 35m below ground level and excavation cross-sections varying from 25m² to 110m².
      
                                
                             
                                                                            
                                
                                    Geology
                                
                                
                                    
            From the ground surface to the bedrock the geology comprised made ground, river terrace deposits, followed by London Clay, Lambeth Group formation, Thanet Sands and chalk.