Owner
                                
                                
                                    
            Luck Stone Corporation
      
                                
                             
                                                                            
                                
                                    Client
                                
                                
                                    
            Luck Stone Corporation
      
                                
                             
                                                                            
                                                                            
                                
                                    Timeframe
                                
                                
                                    April 2017
                                                                             — June 2018
                                                                                                        
                             
                                                                            
                                
                                    Services performed
                                
                                
                                    
            Conceptual design with various tunnel options. Final tunnel design consisting of drawings, specifications, and calculations. Client support during bid phase.
      
                                
                             
                                                                            
                                
                                    Description
                                
                                
                                    
            Luck Stone Corporation (LSC) opened a new quarry on the Western side of Goose Creek river, a component of the Virginia Scenic Rivers System. A tunnel connects the new Western quarry with the existing South-Eastern one below the river. The rock cover between the tunnel and the river was approximately 50 feet. The tunnel is 1275 feet long with a diameter of 45 feet. It is designed to accommodate large scale mining trucks as well as a conveyor belt for material transport which
is scheduled to be installed in the future.
      
                                
                             
                                                                            
                                
                                    Geology
                                
                                
                                    
            Located within the Culpeper Basin, a sedimentary rock formation characterized to be of Lower Mesozoic Age. The existing Luck Stone quarry is situated in a Diabase intrusion (dyke) of this sedimentary rock.
      
                                
                             
                                                                            
                                
                                    Location
                                
                                
                                    
            Ashburn, VA, USA