Owner
                                
                                
                                    
            Metrolinx and Infrastructure Ontario
      
                                
                             
                                                                            
                                
                                    Client
                                
                                
                                    
            Mobilinx [WeBuild, Amico, Hitachi, Transdev, John Laing]
      
                                
                             
                                                                            
                                                                            
                                
                                    Timeframe
                                
                                
                                    November 2022
                                                                             — May 2023
                                                                                                        
                             
                                                                            
                                
                                    Services performed
                                
                                
                                    
            Design of ground improvement campaign to allow controlled excavation utilising shotcrete for a box jacking under three live GO train tracks.
      
                                
                             
                                                                            
                                
                                    Description
                                
                                
                                    
            The Hurontario LRT line is 18 km of new rapid transit between Port Credit and Steeles in Brampton. It crosses under the GO trains near Port Credit Station using a box jacking system. Dr. G. Sauer & Partners designed a ground improvement campaign using a mix of vertical (from surface) and horizontal (from within excavation) tube-à-manchette grouting to stabilise the ground. In addition a controlled and staged excavation sequence was designed utilising shotcrete, face subdivision and grout lances as additional tool box items. A Senior Tunnel Engineer on site provided engineering support and advisory services during excavation for the staged excavation ahead of each box jacking step utilising a RES-meeting process.
      
                                
                             
                                                                            
                                
                                    Geology
                                
                                
                                    
            Mixed face conditions consisting of hard till, clay  and shale as natural ground and two layers of uncompacted loose gravel backfill materials from an adjacent bridge abutment construction. Obstructions such as wing wall footings.
      
                                
                             
                                                                            
                                
                                    Location
                                
                                
                                    
            Port Credit, Mississauga, GTA, Ontario, Canada