ELLICOTT CITY NORTH TUNNEL

Owner
Howard County Department of Public Works
Client
Kiewit-Traylor JV - KTJV
Cost
$150 million USD
Timeframe
February 2025 — October 2027
Services performed
Design peer review of the Ellicott City North Tunnel (ECNT) crossing under an existing CSX railway, including initial and permanent ground support of the tunnel, a temporary railway bridge including micropile foundation, as well as initial and permanent portal support structure.
Description
The Ellicott City North Tunnel (ECNT) stormwater conveyance project is the largest public works project in Howard County’s history. Once completed, the 18-foot diameter, one-mile long tunnel will reduce the risk of flash flooding by moving rainwater away from Main Street from West End area of Ellicott City directly to the Patapsco River. At the Patapsco River Outfall site, the ECNT will pass under an existing CSX railway line with very low rock over and overburden. Dr. Sauer and Partners (DSP) carried out the peer review of the design of the ECNT crossing under the railway.
Geology
Approximately 4 ft of fill overlying the bedrock of the Ellicott City Granite formation.
Location
Ellicott City, MD, USA

Highlights

  • Hard rock TBM tunnel crossing under CSX railway track
  • Temporary railway bridge with micropile foundation
  • Peer review of ground support for tunnel and portal structure

Railway bridge finite element model

Finite element model of tunnel with low rock cover