HUDSON RIVER TUNNEL

Owner
Gateway Development Commission
Client
Halmar International LLC and FCC Construction Inc - Gateway Tunnel Contractors
Cost
$1.29 billion USD
Timeframe
February 2025 — August 2025
Services performed
Tender design support for cross passages including the initial design concepts for artificial ground freezing (AGF). Assessment of freezing time, energy consumption, volume expansion, shotcrete operations on frozen ground, deformation due to thawing and freezing pressure on running tunnels.
Description
The Gateway Program is a set of passenger rail investments that will fortify rail transportation between New York and New Jersey and along the Northeast Corridor. Package 1C: Hudson River Tunnel will bore and install approximately 7,250-foot-long tunnel section under the river. Part of the contract are nine (9) mined cross passages connecting the two tunnel tubes, of which seven (7) will require Artificial Ground Freezing (AGF) to achieve groundwater cutoff and sufficient stand-up time for the excavation. Dr. Sauer and Partners provided tender design support for cross passages, including the freezing layout design and operation.
Geology
Fill, Organic Soils, Estuarine Deposits, Lacustrine Deposit, Glacial Deposits, Decomposed Rock, Stockton Formation (sandstone)
Location
New York, NY, USA

Highlights

  • Tender design for Artificial Ground Freezing (AGF) operation.
  • Freezing layout design.
  • Crossing beneath the Hudson River.

Cross passage ground freezing pipe layout

Cross passage opening frame