Owner
Virginia Department of Transportation
Timeframe
April 2024
— April 2027
Services performed
Design of temporary sheet pile walls for the excavation of the Mechanically Stabilized Earth (MSE) wall construction as part of a bridge replacement work. Design of temporary launch pit using trench shields for a jack and bore tunnel crossing under I-64.
Description
The I-64 Hampton Roads Express Lanes (HREL) network aims to alleviate congestion and provide motorists with more reliable travel options along I-64 in Newport News, Hampton, Norfolk, and Chesapeake. It will provide a continuous 45-mile network of Express Lanes on I-64. The Newport News Segment (contract 4A/4B) includes widening and reconfiguring of I-64, two (2) bridge replacements and six (6) bridge rehabilitations. Dr. Sauer and Partners provided the design of temporary sheet pile walls for the replacement of the I-64 bridge over LaSalle Avenue, as well as temporary launch pit for a jack and bore tunnel crossing under I-64.
Geology
Fill underlain by the Tabb Formation and the Yorktown Formation (Sand, Clay)