Woodsmith Mine Project

Owner
Anglo American Woodsmith Ltd.
Client
Anglo American Woodsmith Ltd.
Cost
£3.5 billion GBP
Timeframe
May 2020 — June 2026
Services performed
Dr. Sauer & Partners provide technical and commercial support and consulting to Anglo American for the designs of segmental tunnel lining, sprayed concrete tunnel lining and deep shafts construction. On site support includes quality audits and independent checking of the D&B contractor's work.
Description
North Yorkshire holds one of the largest, high grade polyhalite reserves worldwide. It is located within the North York Moors National Park, ca. 1800m below surface. Once processed, this mineral functions as an organic fertilizer to boost harvest. Anglo American is currently developing the infrastructure to mine the polyhalite. This operation requires deep shafts to access the mineral body but also demands an extensive mineral transport system (MTS) to keep the impact on the National Park as minimal as possible. Therefore, at ca. 350m below surface, a series of SCL tunnels link the deep shafts to a conveyor belt system, which again connects the mining operation via a 37km TBM tunnel to its materials handling facility in Wilton. From there the product is transferred to the harbour in Teesside and shipped off.
Geology
Most of the MTS is developed within the Redcar Mudstone Formation. It comprises alternating layers of silty mudstone and clayey siltstones with subordinated thin beds of limestone and sandstone. Bands of ironstone nodules and fossil shells as well as pyrite are present in places. Multiple major fault systems were identified that cut the MTS alignment.
Location
Yorkshire, UK

Highlights

  • Fusion between mining operation requirements and transport system standards
  • Complex interfaces between deep shafts, SCL works and TBM drives in hard rock
  • Project management within a dynamic, interdisciplinary team

Project overview

Woodsmith mine site close to Whitby